Project Brupegvídeo
Brupeg's Marine Electrical Upgrade Begins - Ep.359
11 de junho de 2024 · 29 min · 27K visualizações
O que este vídeo aborda
Damien and Jess are performing a complete overhaul of the electrical system on their vessel, Brupeg, a converted fishing trawler. The project involves stripping the existing battery room to bare steel, removing old Victron charge controllers and inverters, and installing a new, organized layout.1:55 During the demolition, the crew discovered significant rust beneath plywood panels that had been glued over chlorinated rubber paint, necessitating a move to a commercial dock to needle-gun the steel and apply fresh primer and paint.10:58
The upgrade includes fabricating a new hinged aluminum faceplate for the electrical panel, installing DIN rails, and repurposing stainless steel grids as cable trays.9:16 An electrician is assisting with the design and wiring, including the installation of a stainless steel frame for the generator control box.27:24 The team is also replacing old plumbing with braided stainless steel lines to eliminate hose clamps.12:48 The project aims to resolve long-standing electrical issues, including damaged battery management systems (BMS) that had melted due to heat.14:13
Mais de Project Brupeg
De Project Brupeg — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



