MISSING You | PIRATE SHIP S17E09
24 de dezembro de 2024 · 29 min · 37K visualizações · Paradise Village Marina, Nuevo Vallarta
O que este vídeo aborda
The crew of *Miss Lone Star* performs a series of maintenance projects while docked at Paradise Village Marina in Nuevo, Mexico.4:53 To prepare for future offshore sailing, they hire a welder named Arturo to install stainless steel davits on the stern, requiring the use of argon gas for welding.8:15 The crew also focuses on cosmetic and structural upkeep, including sanding and applying four coats of Cetol varnish to the boat's ladder and rub rails.14:29 They evaluate the cost of professional exterior maintenance, receiving a quote of $5,500 for sanding and $7,500 for varnishing, which leads them to continue performing the labor themselves to save costs.18:38 The owner notes the difficulty of identifying existing varnish types—specifically distinguishing between Epifanes and Cetol—when performing spot repairs.17:12 Additionally, the crew works to improve dinghy operations by cleaning their Highfield dinghy and planning for a more powerful outboard motor to replace their current 3.5-horsepower unit.10:50 Consistent daily maintenance remains essential to combat the corrosive effects of the marine environment.
Barcos neste vídeo
Mais de Sailing Miss Lone Star
De Sailing Miss Lone Star — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



