CAPTAIN ZIANEvídeo
I am given a dinghy to restore and I install new equipment.
19 de março de 2025 · 16 min · 1K visualizações
O que este vídeo aborda
Refinishing the interior wood and restoring a 2.6-meter inflatable dinghy occupy the primary maintenance tasks before a planned passage to Algeria.10:19 The cabin floorboards, damaged by sun exposure and heavy foot traffic, require sanding with coarse and fine-grit paper before applying five coats of Epifanes varnish.3:31 The dinghy restoration involves removing the degraded, yellowed neoprene adhesive from the floor and transom using Cif cleaner and a metal sponge.10:45 After degreasing the surfaces with acetone, the floor is re-bonded to the tubes using specialized PVC adhesive applied in a double-coat process.12:10 A trolley wheel serves as a makeshift roller to eliminate air bubbles during the bonding process.12:29 Additionally, a Victron battery monitor is installed to track voltage and charge status via Bluetooth.14:01 The installation requires tapping holes to accommodate the monitor's wiring terminals.15:29 A fellow sailor assisted with mast work and provided the replacement dinghy, which was essential for the project.7:47
Mais de CAPTAIN ZIANE
De CAPTAIN ZIANE — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



