CAPTAIN ZIANEvideo

I am given a dinghy to restore and I install new equipment.

19 March 2025 · 16 min · 1K views

What this video covers

Refinishing the interior wood and restoring a 2.6-meter inflatable dinghy occupy the primary maintenance tasks before a planned passage to Algeria.10:19 The cabin floorboards, damaged by sun exposure and heavy foot traffic, require sanding with coarse and fine-grit paper before applying five coats of Epifanes varnish.3:31 The dinghy restoration involves removing the degraded, yellowed neoprene adhesive from the floor and transom using Cif cleaner and a metal sponge.10:45 After degreasing the surfaces with acetone, the floor is re-bonded to the tubes using specialized PVC adhesive applied in a double-coat process.12:10 A trolley wheel serves as a makeshift roller to eliminate air bubbles during the bonding process.12:29 Additionally, a Victron battery monitor is installed to track voltage and charge status via Bluetooth.14:01 The installation requires tapping holes to accommodate the monitor's wiring terminals.15:29 A fellow sailor assisted with mast work and provided the replacement dinghy, which was essential for the project.7:47

Watch on YouTube

More from CAPTAIN ZIANE

I'M ARRIVING IN ALGERIA BY SAILBOAT! My arrival in Algeria: a dream come true.Aug 2026Visiting Bizerte, I have 48 hours before the next weather window to head back out to sea.Aug 2026Finally setting sail after a month and a half at the shipyard. Bound for Algeria.Aug 2026The shipyard nightmare has completely worn me out.Aug 2026

From CAPTAIN ZIANE — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue