WhiteSpotPiratesvídeo
This new information might change everything!
24 de junho de 2026 · 7 min · 25 visualizações · Lübeck
O que este vídeo aborda
Nike is refitting a 100-year-old steel vessel exceeding 20 meters in length, which requires specific certification for European Union inland waterways.0:14 Current regulations in Germany mandate hull repairs via plate inserts, a process that necessitates removing internal concrete ballast at a significant cost.1:31 After consulting with the owners of The Flying Kony, Nike discovered that Dutch surveyors may permit double plating, which avoids the need for ballast removal and reduces repair expenses.1:59 Nike is currently seeking recertification through a Dutch agency to bypass German requirements.2:25 Additionally, the vessel’s electrical system failed due to a dead battery bank, which caused the Victron remote control to shut down and subsequently disabled the solar charging system.5:20 Nike plans to replace the starter battery bank to restore navigation instruments and engine functionality before moving the 46-ton boat to a new haul-out location.6:14
Mais de WhiteSpotPirates
De WhiteSpotPirates — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



