Expedition Engineeringvídeo

Vacuum Bag is Hard. Squeegee is Easy. (it's finally coming together LITERALLY) (7)

24 de abril de 2024 · 20 min · 63K visualizações

O que este vídeo aborda

Fabricating structural legs for a boat’s dodger arch requires balancing strength and weight while maintaining precise curves.2:23 The project involves laying up S-glass and epoxy over a foam-core form to create rigid, lightweight supports.4:52 Initial attempts using vacuum bagging on a single leg resulted in voids and puckering, prompting a shift to a wet-layup method.5:59 This alternative technique involves wetting the fiberglass, squeegeeing out excess epoxy, and wrapping the assembly in plastic to compress the layers.10:30 Comparing the two methods, the squeegee-and-plastic technique produced a leg 20 grams lighter than the vacuum-bagged version while achieving a similar finish.11:37 To ensure structural integrity for mounting, the team incorporates a metal base plate into the carbon fiber layup, allowing for secure attachment points.14:32 Proper timing of the epoxy cure is critical; the material must reach a tacky state before adding subsequent layers to avoid excessive heat or thickness.9:40 Using a test piece, such as a chart plotter box, helps gauge the optimal curing stage for secondary layups.10:09

Assistir no YouTube

Mais de Expedition Engineering

The Reason We’ve Changed (27)ago. de 2026One Year Update - Custom Carbon Fiber Hardtop (26)jul. de 2026Wake-Up Call: The Critical Failure That Could Have Been VERY BAD (25)jun. de 2026Our Boat Kept Getting Slower. This Was Why. (24)jun. de 2026

De Expedition Engineering — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema