Expedition Engineeringvídeo

Wake-Up Call: The Critical Failure That Could Have Been VERY BAD (25)

30 de junho de 2026 · 20 min · 39K visualizações · Bahamas

O que este vídeo aborda

A sailor replaces a failed headsail furler while anchored in the Bahamas after the unit seized due to 20 years of salt and corrosion.7:19 To remove the seized lower extrusion from the furler, the sailor uses a heat gun, a grinder with a cut-off wheel, and a hammer to break the bond.7:48 After cleaning the components with sandpaper, the sailor shrinks the metal by placing the part in a freezer for one hour, allowing for a successful reassembly.8:59 The installation requires loosening all standing rigging to create enough slack to slide the new unit onto the forestay.3:08 Once the furler is installed, the sailor re-tunes the rig under sail in 15 knots of wind, keeping the cotter pins out until the mast is properly tensioned and straight.18:51 The sailor also uses a 3D printer and ASA CF filament to fabricate a custom locking device for the furler assembly.4:57

Assistir no YouTube

Mais de Expedition Engineering

The Reason We’ve Changed (27)ago. de 2026One Year Update - Custom Carbon Fiber Hardtop (26)jul. de 2026Our Boat Kept Getting Slower. This Was Why. (24)jun. de 2026A Few Less PROBLEMS Than Yesterday 23abr. de 2026

De Expedition Engineering — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema