Sailing Suriavídeo
Suria gets Coppercoat. Shipyard stay for long-distance cruising / sailing
15 de outubro de 2023 · 22 min · 2K visualizações · Portimão
O que este vídeo aborda
The crew of the 41-foot Lagoon 410 S2 catamaran Suria hauled their vessel at a shipyard in Portimão, Portugal, to apply a Coppercoat antifouling system.0:37 Because the boat’s 7.10-meter beam exceeded the capacity of the smaller travel lift, a 300-ton lift was required for the haul-out.0:47 During the process, the crew replaced a leaking through-hull fitting by cutting off the old collar, knocking the fitting inward, and installing a new plastic valve sealed with Pantera sealant.11:06 While on the hard, the owner also performed interior modifications, including building custom deep-storage drawers for the galley and installing new clips on the chimney cover.15:22 The shipyard team applied four layers of Coppercoat over the existing primer, followed by a final sanding to expose the copper.17:24 The crew lived aboard during the two-week project, utilizing provided shore power and water.10:58 The shipyard also managed minor hull gelcoat repairs and color matching for the vessel's gold-colored finish.18:53
Barcos neste vídeo
Mais de Sailing Suria
De Sailing Suria — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



