Sailing Catalpavídeo

An important Modification for Safety Ep 397

4 de março de 2024 · 18 min · 12K visualizações

O que este vídeo aborda

The crew of the vessel Catalpa performs maintenance on the boat’s chain plates and bow rollers while hauled out in a boatyard. To address water intrusion, the crew removes old sealant from approximately 12 chain plates and reseals them using 3M 4200, opting against 5200 to ensure future accessibility for rigging work.0:26 Simultaneously, the owner modifies the bow roller assembly because the existing rollers are too close together, causing the chain to pull at an angle and slip off the track.3:52 The project involves cutting the stainless steel assembly, spreading the rollers apart to align with the gypsy, and welding a new reinforcing bar over the top to prevent the chain from jumping out.7:11 The owner cleans and polishes the stainless steel components before welding.8:02 Separately, the crew begins sanding and repainting the anchor locker to remove mold and old paint before reinstalling the recently re-galvanized anchor chain.16:56

Assistir no YouTube

Mais de Sailing Catalpa

they weren't expecting thisset. de 2026one of the most remote islands on the planetset. de 202629 days sailing Panama to French Polynesia the whole passageago. de 2026what did we learn from a month at seaago. de 2026

De Sailing Catalpa — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema