Sailing Catalpavideo
An important Modification for Safety Ep 397
4 March 2024 · 18 min · 12K views
What this video covers
The crew of the vessel Catalpa performs maintenance on the boat’s chain plates and bow rollers while hauled out in a boatyard. To address water intrusion, the crew removes old sealant from approximately 12 chain plates and reseals them using 3M 4200, opting against 5200 to ensure future accessibility for rigging work.0:26 Simultaneously, the owner modifies the bow roller assembly because the existing rollers are too close together, causing the chain to pull at an angle and slip off the track.3:52 The project involves cutting the stainless steel assembly, spreading the rollers apart to align with the gypsy, and welding a new reinforcing bar over the top to prevent the chain from jumping out.7:11 The owner cleans and polishes the stainless steel components before welding.8:02 Separately, the crew begins sanding and repainting the anchor locker to remove mold and old paint before reinstalling the recently re-galvanized anchor chain.16:56
More from Sailing Catalpa
From Sailing Catalpa — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



