Sailing Squibvídeo
Sailing Squib - We'll take care of the rest on the way - Belgrade - Iron Gates /12
8 de janeiro de 2026 · 20 min · 1K visualizações · Danube river near Smederevo
Sailing past abandoned bridge under stormy sky on Danube
O que este vídeo aborda
The crew of the pocket catamaran *Squib* navigates the Danube River from Belgrade toward the Iron Gates, managing mechanical repairs and navigation challenges while transiting through Serbia. During the passage, the crew identifies the cause of a persistent GPS and AIS failure: a loose cable loop under the device carrier had snagged on the rudder quadrant, severing the antenna wire.13:23 They perform an emergency field repair by soldering the fine copper strands and securing the cable with zip ties inside an inspection hatch to prevent future interference.14:03 The crew also addresses a loose alternator mounting bolt and confirms the engine oil level is clean and sufficient.18:31 While motoring, they encounter varying currents and wind speeds, noting a significant speed increase when the wind shifts to a following breeze.9:47 They anchor for the night in the winter harbor of Kiseljevo, recording a minimum depth of 2.6 meters at the entrance.12:32 The crew plans to clear customs out of Serbia near Veliko Gradiste before entering Romania.19:20
Mais de Sailing Squib
De Sailing Squib — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



