Sailing Squibvidéo

Sailing Squib - We'll take care of the rest on the way - Belgrade - Iron Gates /12

8 janvier 2026 · 20 min · 1K vues · Danube river near Smederevo

Sailing past abandoned bridge under stormy sky on Danube

Ce que couvre cette vidéo

The crew of the pocket catamaran *Squib* navigates the Danube River from Belgrade toward the Iron Gates, managing mechanical repairs and navigation challenges while transiting through Serbia. During the passage, the crew identifies the cause of a persistent GPS and AIS failure: a loose cable loop under the device carrier had snagged on the rudder quadrant, severing the antenna wire.13:23 They perform an emergency field repair by soldering the fine copper strands and securing the cable with zip ties inside an inspection hatch to prevent future interference.14:03 The crew also addresses a loose alternator mounting bolt and confirms the engine oil level is clean and sufficient.18:31 While motoring, they encounter varying currents and wind speeds, noting a significant speed increase when the wind shifts to a following breeze.9:47 They anchor for the night in the winter harbor of Kiseljevo, recording a minimum depth of 2.6 meters at the entrance.12:32 The crew plans to clear customs out of Serbia near Veliko Gradiste before entering Romania.19:20

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33juin 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème