Mais
Idioma
Modo de exibição
Sven Yrvindvídeo
30 de janeiro de 2026 · 6 min · 2K visualizações
O que este vídeo aborda
Sven Yrvind prepares a masthead fitting for his small boat by bonding it with epoxy.▶ 2:54 He drills a hole into the fitting to inject epoxy, ensuring a secure connection to the mast.▶ 2:54 The process involves sanding the surfaces to improve adhesion before applying the adhesive.▶ 3:52 Yrvind notes the structural differences between carbon fiber and fiberglass masts, adjusting his technique to accommodate the material properties of each.▶ 4:51 This masthead assembly supports the topping lift, a critical component for his planned 14,000-mile voyage from the North Atlantic to New Zealand.▶ 2:25 He uses a hammer to seat the fitting firmly into place, prioritizing structural integrity for the upcoming long-distance passage.▶ 2:54
Mais de Sven Yrvind
De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.