Sailing Squibvídeo
Squib's Refit - Episode 27
22 de junho de 2023 · 23 min · 763 visualizações · Vienna-Kuchelau
O que este vídeo aborda
Peter and Sabina continue the extensive refit of their pocket catamaran, Squib, focusing on structural repairs to the cabin roof and the final preparation of the arch-style equipment rack. To improve the functionality of the deck hatches, Peter cuts back the surrounding roof edges to allow the hatches to open fully to a horizontal position, subsequently sealing the modifications with epoxy and fiberglass matting.4:23 The crew also relocates the water tank and holding tank deck fittings to optimize hose routing and eliminate redundant through-deck holes, which are filled and faired with thickened epoxy.8:27
Work on the equipment rack involves intensive sanding and filling to achieve a smooth finish before applying primer.1:37 Sabina assists by refinishing the port-side wet locker.4:23 Additionally, Peter removes and disassembles the cabin windows to address leaks, using a multi-tool to cut through hardened adhesive sealant.20:36 The project concludes with preparations for applying the first coat of primer over the Whitsun weekend, contingent on favorable weather forecasts.16:57 Peter notes that the refit is a multi-year, labor-intensive process requiring hundreds of hours of sanding and structural work.
Mais de Sailing Squib
De Sailing Squib — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



