Sailing Squibvideo

Squib's Refit - Episode 27

22 June 2023 · 23 min · 763 views · Vienna-Kuchelau

What this video covers

Peter and Sabina continue the extensive refit of their pocket catamaran, Squib, focusing on structural repairs to the cabin roof and the final preparation of the arch-style equipment rack. To improve the functionality of the deck hatches, Peter cuts back the surrounding roof edges to allow the hatches to open fully to a horizontal position, subsequently sealing the modifications with epoxy and fiberglass matting.4:23 The crew also relocates the water tank and holding tank deck fittings to optimize hose routing and eliminate redundant through-deck holes, which are filled and faired with thickened epoxy.8:27

Work on the equipment rack involves intensive sanding and filling to achieve a smooth finish before applying primer.1:37 Sabina assists by refinishing the port-side wet locker.4:23 Additionally, Peter removes and disassembles the cabin windows to address leaks, using a multi-tool to cut through hardened adhesive sealant.20:36 The project concludes with preparations for applying the first coat of primer over the Whitsun weekend, contingent on favorable weather forecasts.16:57 Peter notes that the refit is a multi-year, labor-intensive process requiring hundreds of hours of sanding and structural work.

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engineOct 2026Sailing Squib - May 2026 /4Oct 2026Sailing Squib - May 2026/3Sept 2026Sailing Squib May 2026 /2Aug 2026

From Sailing Squib — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue