Sven Yrvindvídeo
20 Aug 2025 Closing the gap in the wall of the dining room
19 de agosto de 2025 · 3 min · 2K visualizações
O que este vídeo aborda
Sven Yrvind completes the structural work on the gallium boat's interior wall, transitioning focus to the construction of the hatch.▶ 0:00 He evaluates the placement of a pump intended to manage vessel stability by transferring seawater into ballast containers.▶ 0:24 After reconsidering his immediate priorities, he decides to seal a gap in the aft section of the cabin rather than beginning the hatch installation.▶ 0:49 He cuts a custom wooden panel to fit the space, secures it with clamps, and applies epoxy to bond the piece to the bulkhead.▶ 1:54 This panel serves as a structural support and a backrest for the interior seating area.▶ 2:24 The process of fitting the aft edge provides a template for the subsequent construction of the forward edge.▶ 1:29
Mais de Sven Yrvind
De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



