WINTERIZING our C&C Landfall 43 for a cold Canadian Winter [E261]
21 de setembro de 2023 · 24 min · 2K visualizações · Maritime Canada
O que este vídeo aborda
Winterizing a C&C Landfall 43 for a Canadian winter involves removing the mainsail, winterizing the engine, and managing multiple water tanks. The crew removes the mainsail by sliding the stack pack and full battens out of the mast track.7:47 To winterize the engine, they run antifreeze through the intake system, using a heat gun to soften and remove stubborn, cold-stiffened hoses.17:59 The boat features four water tanks; the crew disconnects the lines to each to ensure all water is drained before adding antifreeze.22:18 Electrical troubleshooting reveals the wind turbine is outputting only 5 volts due to corroded, undersized 10-gauge wiring, prompting the crew to remove the unit for inspection.16:08 Temporary leak mitigation includes applying 3M 4200 sealant around window gaskets and using tape to identify leak sources for future repair.18:28 The crew also stores a spare VHF antenna and organizes charts found on board.19:17 A heat gun effectively loosens stiff, cold hoses for removal.17:59
Mais de Wildly Intrepid Sailing
De Wildly Intrepid Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



