Sail Lifevídeo

Sail Life - First coat of primer & steering pedestal - sailboat project

26 de julho de 2020 · 17 min · 83K visualizações

O que este vídeo aborda

Mads completes the hull fairing process on Athena, a 1987 Warrior 38, after approximately 100 hours of labor.0:50 To prepare for painting, he cleans the hull with water, degreaser soap, and a Scotch-Brite pad, avoiding solvents that could contaminate the fairing compound.8:38 He applies a single coat of Interprime 820 epoxy primer using mohair rollers, as foam rollers disintegrated upon contact with the product.12:10 He plans to apply five additional coats of primer, followed by undercoat and Perfection Pro paint, as weather permits.12:37

Simultaneously, he rebuilds the steering pedestal, reusing the original aluminum column while replacing the brake housing and bearings.2:41 He seals the pedestal base and mounting bolts in the cockpit using butyl tape, tightening the fasteners in stages to ensure a watertight seal.13:06 He also patches three old holes in the hull by grinding a bevel and laying up fiberglass on the interior.14:55 The project concludes with the transition of the hull fairing task to the completed section of his project management board.15:33

Assistir no YouTube

Barcos neste vídeo

Warrior 38O barco deles

Mais de Sail Life

The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694set. de 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693ago. de 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692ago. de 2026The road back to boat work: Cutting trees, picking up plywood, and 240V in the shop. Ep. 691ago. de 2026

De Sail Life — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema