Hold Fast!vídeo
S/V SeaSprite Refit Update 8 September 2026
8 de setembro de 2026 · 2 min · 2K visualizações · Phipps Boatworks, Harrington Harbor North, Maryland
O que este vídeo aborda
The Sea SPRITE 30 has been moved into the Phipps Boatworks building at Harrington Harbor North, where the shrink wrap and frame have been removed and a refit is underway.0:34 The interior is being cleared out — deck hardware has been boxed up, though the box is heavy enough to require help moving, and the stove also needs assistance to remove.0:39 Some items remain aboard temporarily while Lizzie thinks through what will be needed during the project versus what can be staged off the boat.1:43 The building has a large full-building fan running, which matters given warm outside temperatures.0:26 The work is in early-stage organization: the priority is stripping unnecessary gear to give clear access for the project ahead.0:39 Phipps Boatworks is described as a well-equipped facility with the tools and resources needed for a refit of this scope.1:47
Mais de Hold Fast!
De Hold Fast! — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



