Hold Fast!vídeo

S/V SeaSprite Refit Update 4 Oct 2026

4 de outubro de 2026 · 7 min · 4K visualizações · Phipps Boatworks

O que este vídeo aborda

The S/V SeaSprite refit at Phipps Boatworks focuses on exterior varnish preparation and interior structural modifications. The toe rails and eyebrows are sanded to 220 grit, with varnish application scheduled to precede deck painting to prevent surface damage.0:14 Mast repairs are complete, with several unnecessary holes welded shut to prepare the spar for painting.0:53 Interior work involves removing all locker doors, hatch covers, and trim for off-site varnishing, while the boat’s interior surfaces receive a combination of satin and high-gloss finishes.2:13 The crew plans to install closed-cell foam insulation behind the V-berth ceiling boards and paint the supporting wood white to improve visibility for maintenance.5:54 Additionally, the salon hatch requires enlargement to provide full access to both compartments of the water tank for cleaning.6:56 The project remains in a state of cumulative progress, with the current phase prioritizing finish work and structural accessibility.

Assistir no YouTube

Barcos neste vídeo

Sea SPRITE 30O barco delesCabo RICO 38O barco delesCabo RICO 56O barco deles

Mais de Hold Fast!

Hinckley Bermuda 40 MKIII Survey & Sea Trial out. de 2026S/V SeaSprite Refit Update 18-20 Sep 2026set. de 2026S/V SeaSprite Refit Update 9 September 2026set. de 2026S/V SeaSprite Refit Update 8 September 2026set. de 2026

De Hold Fast! — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema