BREAKING GROUND ON OUR NEXT BIG OFF GRID PROJECT!
7 de julho de 2024 · 30 min · 136K visualizações
O que este vídeo aborda
Matt and Kristen construct a 36-by-20-foot pavilion to provide shade and weather protection for a trailer on their property.3:16 The project requires 12 isolated concrete footings, with the four corner footings measuring 2 feet by 2 feet by 2 feet and the remaining eight measuring 16 inches by 16 inches by 20 inches.5:42 Matt uses number 4 rebar to reinforce the footings, bending the steel into cages to ensure structural integrity.17:50 He builds wooden forms for the top 4 inches of each footing to achieve a level surface for the post bases.7:25 After mixing and pouring approximately 6,000 pounds of concrete, the team completes the foundation.28:46 The project faces a potential delay due to an approaching tropical disturbance, which may require the crew to secure their boat, Good, Bad, and Ugly, at a different location.28:26
Mais de Sailing Good, Bad, and Ugly
De Sailing Good, Bad, and Ugly — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



