Sailing Good, Bad, and Uglyvidéo

BREAKING GROUND ON OUR NEXT BIG OFF GRID PROJECT!

7 juillet 2024 · 30 min · 136K vues

Ce que couvre cette vidéo

Matt and Kristen construct a 36-by-20-foot pavilion to provide shade and weather protection for a trailer on their property.3:16 The project requires 12 isolated concrete footings, with the four corner footings measuring 2 feet by 2 feet by 2 feet and the remaining eight measuring 16 inches by 16 inches by 20 inches.5:42 Matt uses number 4 rebar to reinforce the footings, bending the steel into cages to ensure structural integrity.17:50 He builds wooden forms for the top 4 inches of each footing to achieve a level surface for the post bases.7:25 After mixing and pouring approximately 6,000 pounds of concrete, the team completes the foundation.28:46 The project faces a potential delay due to an approaching tropical disturbance, which may require the crew to secure their boat, Good, Bad, and Ugly, at a different location.28:26

Regarder sur YouTube

Plus de vidéos de Sailing Good, Bad, and Ugly

BIG SPLURGE IS IT WORTH IT?!sept. 2026Infested, Moldy Disaster to Dream Transformation Start to Finishsept. 2026IT’S FINALLY DONE!sept. 2026We Needed a Win and This Wasn’t Itaoût 2026

De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème