Mais
Idioma
Modo de exibição
Sven Yrvindvídeo
29 de novembro de 2025 · 3 min · 2K visualizações
O que este vídeo aborda
Sven Yrvind installs the keels on his small boat by filling gaps between the hull and the keel structure with epoxy.▶ 0:33 He utilizes the gap-filling properties of epoxy and the force of gravity to ensure a precise, waterproof fit within the cavities.▶ 0:52 After the epoxy cures, he applies fiberglass to the top and bottom sections of the keel assembly.▶ 2:21 To improve visibility during the lamination process, he adds extra lamps to the workspace to eliminate dim lighting and ensure the fiberglass conforms properly to the hull curves.▶ 2:01 The process results in a secure, well-fitted keel installation.▶ 2:25
Mais de Sven Yrvind
De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.