Project Brupegvídeo

Making our Water Tight Doors - Building Brupeg EP. 55

5 de novembro de 2018 · 28 min · 27K visualizações

O que este vídeo aborda

Damien fabricates custom watertight door dogs for the engine room bulkhead on the vessel Brupeg.Watch He constructs the latching mechanism using one-inch stainless steel bolts, scrap stainless plate, and nyloc nuts, avoiding the need for professional machining.2:54 Each dog features a grease nipple for lubrication and a D-shaped cutout to prevent the handle from spinning on the bolt.1:27 To weld the thin stainless components, he uses a series of overlapping high-heat bursts rather than a single continuous bead, which allows for a solid, polishable seal.10:56 The door assembly includes a rubber gasket compressed by the dogs to seal the engine bay from the accommodation.2:10 After initial installation, the door jams against the frame due to the thickness of the rubber seal, requiring the stainless steel lip to be trimmed by five millimeters to ensure a proper fit.26:47 The project remains on hold pending further adjustments to the frame.27:54

Ver no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.46310/2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.46209/2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.46109/2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema