Project Brupegvídeo
CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462
26 de setembro de 2026 · 35 min · 42K visualizações
O que este vídeo aborda
The owners of the 10-year rebuild project vessel Brupeg perform a night-time haul-out using a trailer and a crane to address anti-fouling maintenance. Before the haul-out, the crew replaces two leaking hydraulic steering rams that failed due to corrosion on the mild steel fittings.8:41 To prevent future corrosion on the new hydraulic lines, they wrap the fittings in Denso tape, a wax-impregnated protective wrap.17:11 The vessel, which features a complex double-acting hydraulic steering system, also suffers from a jammed pintle bearing caused by a nylon bush that swelled after absorbing water.6:10 During the haul-out process, the crew navigates the vessel onto a submerged trailer in low-light conditions, guided by external operators.23:12 Shortly after the boat clears the water, a pipe failure occurs, causing a fluid leak that the crew manages by closing a valve.27:48 The owners plan to relocate the vessel to Tasmania to conduct marine research projects and complete the interior and systems work in a cooler climate.8:24
Mais de Project Brupeg
De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



