Project Brupegvídeo

Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461

20 de setembro de 2026 · 24 min · 22K visualizações

O que este vídeo aborda

The crew of the 10-year-rebuilt fishing trawler *Brewpeg* prepares for an unscheduled haul-out by cleaning the vessel’s hull and stabilizers and performing maintenance on onboard systems.0:15 After using a new dinghy winch to lift the tender, the crew water-blasts barnacles and marine growth from the dinghy’s bottom to improve speed for transport runs.Watch They also remove soft weed and hard growth from the trawler’s horizontal stabilizer wings, noting that Jotun C Victor 50 antifouling paint has performed well in tropical conditions despite 15 months of submersion.

To prepare for upcoming repairs, the crew sources argon gas for a TIG welder to install new stainless steel water pickups in the internal tanks, which will allow access to the bottom 300 liters of water. They also plan to needle-gun and repaint localized rust spots inside the tanks and on the stabilizer mounting bolts. The maintenance includes replacing rusted bearings on a utility cart and repairing a damaged air compressor hose. The vessel is scheduled to move to a nearby anchorage before being hauled out for further structural work.

Ver no YouTube

Mais de Project Brupeg

The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026Inventing our way out of a problem - Project Brupeg Ep.45909/2026Over Engineering a Simple Bracket - Project Brupeg Ep. 45808/2026How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.45708/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema