Cutting Our Losses (20)
8 de outubro de 2025 · 10 min · 46K visualizações
Crew bends stainless railing on dock at golden hour
O que este vídeo aborda
Replacing corroded helm seals involves drilling a small hole into the old seal, inserting a screw, and using vise grips to pull the component out.0:54 This method allows for a quick replacement without damaging the shaft or bearing. When working with stainless steel, using high-quality drill bits specifically designed for the material prevents premature tool failure.2:45 Attempting to bend stainless steel tubing by hand without proper equipment often results in snapped welds and structural deformation.5:11 When modifications to a custom stern rail fail, cutting the tubing to simplify the geometry and mounting the outboard motor to the side of the sugar scoop provides a functional alternative.5:40 To ensure a secure mount in a carbon fiber hull, excavate the foam core around mounting holes before filling with silica-thickened epoxy to distribute mechanical loads.7:38 Leaving the remaining mounting points for professional fabrication allows for departure from the marina on schedule.8:47
Mais de Expedition Engineering
De Expedition Engineering — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



