Plus
Langue
Mode d'affichage
8 octobre 2025 · 10 min · 46K vues
Crew bends stainless railing on dock at golden hour
Ce que couvre cette vidéo
Replacing corroded helm seals involves drilling a small hole into the old seal, inserting a screw, and using vise grips to pull the component out.▶ 0:54 This method allows for a quick replacement without damaging the shaft or bearing. When working with stainless steel, using high-quality drill bits specifically designed for the material prevents premature tool failure.▶ 2:46 Attempting to bend stainless steel tubing by hand without proper equipment often results in snapped welds and structural deformation.▶ 5:10 When modifications to a custom stern rail fail, cutting the tubing to simplify the geometry and mounting the outboard motor to the side of the sugar scoop provides a functional alternative.▶ 5:37 To ensure a secure mount in a carbon fiber hull, excavate the foam core around mounting holes before filling with silica-thickened epoxy to distribute mechanical loads.▶ 7:21 Leaving the remaining mounting points for professional fabrication allows for departure from the marina on schedule.▶ 8:48
Plus de vidéos de Expedition Engineering
De Expedition Engineering — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.