Expedition Engineeringvideo

Cutting Our Losses (20)

8 de octubre de 2025 · 10 min · 46K vistas

Crew bends stainless railing on dock at golden hour

¿Qué cubre este video?

Replacing corroded helm seals involves drilling a small hole into the old seal, inserting a screw, and using vise grips to pull the component out.0:54 This method allows for a quick replacement without damaging the shaft or bearing. When working with stainless steel, using high-quality drill bits specifically designed for the material prevents premature tool failure.2:45 Attempting to bend stainless steel tubing by hand without proper equipment often results in snapped welds and structural deformation.5:11 When modifications to a custom stern rail fail, cutting the tubing to simplify the geometry and mounting the outboard motor to the side of the sugar scoop provides a functional alternative.5:40 To ensure a secure mount in a carbon fiber hull, excavate the foam core around mounting holes before filling with silica-thickened epoxy to distribute mechanical loads.7:38 Leaving the remaining mounting points for professional fabrication allows for departure from the marina on schedule.8:47

Ver en YouTube

Más de Expedition Engineering

The Reason We’ve Changed (27)ago 2026One Year Update - Custom Carbon Fiber Hardtop (26)jul 2026Wake-Up Call: The Critical Failure That Could Have Been VERY BAD (25)jun 2026Our Boat Kept Getting Slower. This Was Why. (24)jun 2026

De Expedition Engineering — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema