sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Classic Yacht TV · vídeo

EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IV

4 de janeiro de 2026 · 20 min · 7K visualizações

Ver no YouTube

O que este vídeo aborda

Green oak frames for the schooner Malabar IV are steam-bent and fitted in a single day, with pairs of frames cycled through a steaming box at five-minute intervals, ten minutes between each pair.▶ 8:19 The tight schedule — driven by the need to clamp each frame before it cools and becomes brittle — means the crew works flat out for most of the day, managing roughly two-thirds of the boat's frames before finishing.▶ 9:33 In the forward third of the hull, where the shape grows more extreme, the frames require a relief cut sawn down the centre to allow the two strips to slide against each other and take the tighter curves.▶ 10:25 A miscalculation in how far down those relief cuts were made causes several frames to push out of fair at the bilge; the fix is trimming approximately four inches off the bottom of each frame on the chop saw before it goes into the boat, giving the flexible section enough length to reach the pocket.▶ 10:30 Clamp alignment while bending proves consistently difficult, particularly keeping the two halves of each sawn frame flush with each other.▶ 7:04 The crew avoids screws in the turn of the bilge and the centre of the build throughout.▶ 2:53 Relief-cut depth must account for the full length of the straight section that seats in the frame pocket, or the frame will not bend where needed.

Mais de Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IV05/2026EP09 Positioning laminated floors and frames, summer recap #3: Building the schooner Malabar IV12/2025EP08 Making laminated frames, last timber floor, summer recap #2: Building the schooner Malabar IV12/2025EP07 Building the schooner Malabar IV | Summer recap #111/2025

De Classic Yacht TV — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026