sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Classic Yacht TV · vídeo

EP09 Positioning laminated floors and frames, summer recap #3: Building the schooner Malabar IV

14 de dezembro de 2025 · 19 min · 8K visualizações · Cornwall

Ver no YouTube

O que este vídeo aborda

Emily Harris installs the final laminated floor on the schooner Malabar IV, a critical structural component positioned directly below the main mast step.▶ 0:19 The floor's long arms are designed to transfer ballast keel loads into the frames and distribute rigging strain up to the deck and chain plates.▶ 0:30 Harris beds the floor with bitumen mastic, uses cotton caulking grommets under the bolt washers to seal the bolt holes against water ingress, and torques the bolts down before the paired frames are lifted into place.▶ 3:19 The frames at this mast-step section are 3 inches thick rather than the standard 2¾ inches, reflecting the concentrated rigging and heeling loads at that station.▶ 4:56 Harris explains why floor arm lengths are deliberately staggered — to avoid a continuous stress line at the frame-to-keel transition, analogous to staggering courses in brickwork.▶ 11:33 Being a two-masted schooner, Malabar IV requires the same structural reinforcement repeated at the foremast position.▶ 4:45 Volunteer crew member Sam, a joinery student, completes his final day chiseling the rabbet before departing; French volunteer Remy has returned for a second stint.▶ 9:35 Harris also notes she is now ready to actively seek a buyer for the completed vessel.▶ 8:49

Mais de Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IV05/2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IV01/2026EP08 Making laminated frames, last timber floor, summer recap #2: Building the schooner Malabar IV12/2025EP07 Building the schooner Malabar IV | Summer recap #111/2025

De Classic Yacht TV — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026