Sailing Yabávídeo

From WRECK to DREAMY starts now! — Sailing Yabá #13

31 de janeiro de 2021 · 25 min · 120K visualizações

O que este vídeo aborda

The restoration of the wooden schooner Yabá focuses on rebuilding the vessel's structural backbone, specifically the forefoot, keel, and stern post.0:41 After removing rotted sections, the crew fabricates new timber components to replace the damaged stern post and forefoot, which houses the propeller shaft.2:44 Workers use stencils derived from the original, degraded wood to cut new frames and structural members from fresh timber.1:15 The process involves iterative fitting, where pieces are measured, cut, chiseled, and tested against the hull to ensure flush joints and proper alignment for future planking.20:39 Beyond the hull work, the crew removes the engine and its anti-vibration mounts to facilitate cleaning, sandblasting, and rust prevention.22:35 By the end of the project phase, the new forefoot is successfully installed, marking the first major structural replacement in the restoration.21:02 The team plans to proceed by installing the keel and then working upward to replace damaged frames and hull planks.23:54

Ver no YouTube

Mais de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabá08/2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabá08/2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabá08/2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabá08/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema