Sailing Yabávidéo
From WRECK to DREAMY starts now! — Sailing Yabá #13
31 janvier 2021 · 25 min · 120K vues
Ce que couvre cette vidéo
The restoration of the wooden schooner Yabá focuses on rebuilding the vessel's structural backbone, specifically the forefoot, keel, and stern post.0:41 After removing rotted sections, the crew fabricates new timber components to replace the damaged stern post and forefoot, which houses the propeller shaft.2:44 Workers use stencils derived from the original, degraded wood to cut new frames and structural members from fresh timber.1:15 The process involves iterative fitting, where pieces are measured, cut, chiseled, and tested against the hull to ensure flush joints and proper alignment for future planking.20:39 Beyond the hull work, the crew removes the engine and its anti-vibration mounts to facilitate cleaning, sandblasting, and rust prevention.22:35 By the end of the project phase, the new forefoot is successfully installed, marking the first major structural replacement in the restoration.21:02 The team plans to proceed by installing the keel and then working upward to replace damaged frames and hull planks.23:54
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



