Entre Terras e Maresvídeo

WE MESSED UP the installation of a GIANT FORMICA sheet, and almost lost the piece for good!

17 de novembro de 2024 · 19 min · 439 visualizações

O que este vídeo aborda

Edgar and Sâmia install 0.8mm-thick laminate sheets on interior bulkheads, a process requiring repeated trimming and fitting to accommodate the non-square geometry of the boat’s hull.8:16 The installation involves applying contact adhesive to both the laminate and the substrate, allowing a 20- to 30-minute drying time before bonding.3:25 During the process, the crew encounters a significant setback when a large laminate piece cracks, forcing them to remove the damaged section and restart the application.12:11 The team notes that while cutting the material is straightforward, the time-intensive phase involves iterative adjustments to ensure the sheets fit flush against the bulkheads and door frames.7:52 After removing the failed piece and cleaning the surface, they successfully re-apply the laminate and finish the bulkhead sections.17:14 The project highlights the fragility of thin laminate and the necessity of precise, repetitive trimming when working in irregular spaces.12:21

Ver no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 18307/2026WE FINISHED the bow cabin LAMINATE ! S1.ep18206/2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 18106/2026This week the focus was on something else06/2026

De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema