Entre Terras e Maresvidéo

WE MESSED UP the installation of a GIANT FORMICA sheet, and almost lost the piece for good!

17 novembre 2024 · 19 min · 439 vues

Ce que couvre cette vidéo

Edgar and Sâmia install 0.8mm-thick laminate sheets on interior bulkheads, a process requiring repeated trimming and fitting to accommodate the non-square geometry of the boat’s hull.8:16 The installation involves applying contact adhesive to both the laminate and the substrate, allowing a 20- to 30-minute drying time before bonding.3:25 During the process, the crew encounters a significant setback when a large laminate piece cracks, forcing them to remove the damaged section and restart the application.12:11 The team notes that while cutting the material is straightforward, the time-intensive phase involves iterative adjustments to ensure the sheets fit flush against the bulkheads and door frames.7:52 After removing the failed piece and cleaning the surface, they successfully re-apply the laminate and finish the bulkhead sections.17:14 The project highlights the fragility of thin laminate and the necessity of precise, repetitive trimming when working in irregular spaces.12:21

Regarder sur YouTube

Plus de vidéos de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juil. 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juin 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juin 2026This week the focus was on something elsejuin 2026

De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème