Project Brupegvídeo

How we ground our expedition boat - Project Brupeg Ep.392

16 de fevereiro de 2025 · 35 min · 23K visualizações

O que este vídeo aborda

The owners of the expedition boat BrewPeg address persistent electrical grounding issues and electrolysis risks by centralizing all negative connections to a common bus bar.19:07 After discovering that a faulty sensor caused 40 amps of starting current to flow through a thin wiring loom, the crew unified the negatives for the main engine, generator, and Victron system.8:00 They maintain an "above-ground" hull configuration to control electron flow and prevent stray current, while installing an external Balmar regulator on the alternator to charge the lithium battery bank.18:59 The project also includes upgrading winch pulleys to accommodate 19mm Dyneema rope and installing a 60mm vent for the battery box, sealed with FixTek 190 to prevent corrosion on the steel hull.29:55 Testing confirms that the alternator successfully charges the battery bank while the common ground prevents unintended current loops.9:57 Proper common-grounding and isolating sensors from the hull are essential for preventing electrolysis and protecting wiring looms in metal vessels.

Ver no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.46310/2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.46209/2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.46109/2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema