Sailing Yabávídeo

Building the SMALL details of a BIG wooden ship! — Sailing Yabá #65

23 de janeiro de 2022 · 24 min · 141K visualizações

O que este vídeo aborda

The restoration of the schooner Yabá continues with the installation of 14 turned wooden stanchions along the port side bulwark.4:53 The crew determined a height of 24 centimeters for the stanchions, cutting them slightly oversized to allow for final sanding.3:01 To prevent the wood from spinning during the lathing process, the carpenters attached a plywood guide to the lathe.3:15 Once positioned, the stanchions are secured with structural epoxy applied to the top and bottom contact points to ensure a watertight seal and structural rigidity.6:28 Future steps include drilling through the center of the stanchions to install a threaded rod for final fastening.16:22 Meanwhile, the engine room is being prepped with primer and paint in anticipation of mounting the engine, and the crew is preparing to fabricate the final four-meter section of the port-side rail.19:23

Ver no YouTube

Mais de Sailing Yabá

Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabá08/2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabá08/2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabá08/2026Sailing Through the World's Largest Atlantic Rainforest! — Sailing Yabá07/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema