Sailing Yabávideo

Building the SMALL details of a BIG wooden ship! — Sailing Yabá #65

23 January 2022 · 24 min · 141K views

What this video covers

The restoration of the schooner Yabá continues with the installation of 14 turned wooden stanchions along the port side bulwark.4:53 The crew determined a height of 24 centimeters for the stanchions, cutting them slightly oversized to allow for final sanding.3:01 To prevent the wood from spinning during the lathing process, the carpenters attached a plywood guide to the lathe.3:15 Once positioned, the stanchions are secured with structural epoxy applied to the top and bottom contact points to ensure a watertight seal and structural rigidity.6:28 Future steps include drilling through the center of the stanchions to install a threaded rod for final fastening.16:22 Meanwhile, the engine room is being prepped with primer and paint in anticipation of mounting the engine, and the crew is preparing to fabricate the final four-meter section of the port-side rail.19:23

Watch on YouTube

More from Sailing Yabá

Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026This Anchorage Was Worth Every Miserable Mile — Sailing YabáAug 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing YabáAug 2026Sailing Through the World's Largest Atlantic Rainforest! — Sailing YabáJul 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue