Sailing Triteiavídeo

Stepping the mast on A 1981 Panda 40 at Seaview West Boatyard in Seattle

9 de novembro de 2020 · 17 min · 3K visualizações · Seaview West Boatyard, Seattle

O que este vídeo aborda

The crew steps the mast of a 1981 Panda 40 at Seaview West Boatyard in Seattle.0:42 After completing bilge painting and glassing work, the team uses a crane to lower the mast onto the boat.0:35 The process requires precise alignment of the mast base with the mast foot to avoid damaging the rubber seal and the Spartite collar.7:09 The crew applies dish soap to the mast collar to reduce friction during the final seating.9:20 During the descent, the mast catches slightly on the back edge, requiring manual adjustment to ensure it seats properly.14:39 Once the base is bolted, the crew tensions the standing rigging to secure the mast in place.15:25 The project also includes a demonstration of a solo docking technique using a single line and the boat in forward gear at low idle to hold the vessel against a dock.4:23 The mast step was raised to compensate for previous compression damage.16:07

Ver no YouTube

Barcos neste vídeo

Alberg 30O barco deles

Mais de Sailing Triteia

Victoria Arrives to Victoria, Mahe, Seychelles and We Sail to Silhouette Island08/2026Forney Cove on Santa Cruz Island From The Channel Islands Cruising Guide08/2026Dangerous Sailing in Coral Passes & Storms in the Maldives on a 30ft Sailboat08/2026Pushing Through The Maldives - Cruising in Paradise At the Wrong Time of Year08/2026

De Sailing Triteia — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema