Sailing Triteiavidéo

Stepping the mast on A 1981 Panda 40 at Seaview West Boatyard in Seattle

9 novembre 2020 · 17 min · 3K vues · Seaview West Boatyard, Seattle

Ce que couvre cette vidéo

The crew steps the mast of a 1981 Panda 40 at Seaview West Boatyard in Seattle.0:42 After completing bilge painting and glassing work, the team uses a crane to lower the mast onto the boat.0:35 The process requires precise alignment of the mast base with the mast foot to avoid damaging the rubber seal and the Spartite collar.7:09 The crew applies dish soap to the mast collar to reduce friction during the final seating.9:20 During the descent, the mast catches slightly on the back edge, requiring manual adjustment to ensure it seats properly.14:39 Once the base is bolted, the crew tensions the standing rigging to secure the mast in place.15:25 The project also includes a demonstration of a solo docking technique using a single line and the boat in forward gear at low idle to hold the vessel against a dock.4:23 The mast step was raised to compensate for previous compression damage.16:07

Regarder sur YouTube

Bateaux dans cette vidéo

Alberg 30Leur bateau

Plus de vidéos de Sailing Triteia

HELLO MADAGASCAR!!! A Dream Come True!!! Sailing To Nosy Be & Getting Cleared In to theoct. 2026A Visit to the French Island of Mayotte, A Hike With Friends & Gear Failure Stopping My Departureoct. 2026Exploring LA DIGUE Island, Sailing Back to Mahe and Saying Goodbye to Victoriasept. 2026Seeing the World Famous Giant Tortoises of the Seychelles!sept. 2026

De Sailing Triteia — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème