Sailing Triteiavídeo

Stepping the mast on A 1981 Panda 40 at Seaview West Boatyard in Seattle

9 de novembro de 2020 · 17 min · 3K visualizações · Seaview West Boatyard, Seattle

O que este vídeo aborda

The crew steps the mast of a 1981 Panda 40 at Seaview West Boatyard in Seattle.0:42 After completing bilge painting and glassing work, the team uses a crane to lower the mast onto the boat.0:35 The process requires precise alignment of the mast base with the mast foot to avoid damaging the rubber seal and the Spartite collar.7:09 The crew applies dish soap to the mast collar to reduce friction during the final seating.9:20 During the descent, the mast catches slightly on the back edge, requiring manual adjustment to ensure it seats properly.14:39 Once the base is bolted, the crew tensions the standing rigging to secure the mast in place.15:25 The project also includes a demonstration of a solo docking technique using a single line and the boat in forward gear at low idle to hold the vessel against a dock.4:23 The mast step was raised to compensate for previous compression damage.16:07

Assistir no YouTube

Barcos neste vídeo

Alberg 30O barco deles

Mais de Sailing Triteia

Victoria Arrives to Victoria, Mahe, Seychelles and We Sail to Silhouette Islandago. de 2026Forney Cove on Santa Cruz Island From The Channel Islands Cruising Guideago. de 2026Dangerous Sailing in Coral Passes & Storms in the Maldives on a 30ft Sailboatago. de 2026Pushing Through The Maldives - Cruising in Paradise At the Wrong Time of Yearago. de 2026

De Sailing Triteia — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema