Sailing Catalpavídeo

One step closer to splashing | Ep 388

24 de dezembro de 2023 · 13 min · 9K visualizações

O que este vídeo aborda

The crew of the 53-foot Catalpa applies a two-part epoxy barrier coat to the vessel’s hull while in a boatyard.0:43 After patching osmosis blisters, the team cleans the fiberglass surface with acetone to ensure proper adhesion.1:01 They use a 3/16-inch nap roller to achieve a smooth finish, applying the epoxy in sections to prevent premature drying and peeling.4:52 The process involves mixing four one-gallon tins of Total Boat barrier coat, which requires a 15-minute induction period before application.9:49 To maintain a continuous wet edge and avoid the need for sanding between layers, the crew applies multiple coats in a single session.8:40 They use Blu-Tac to protect the cutlass bearing adjustment screws from being sealed over during the painting process.2:09 The project concludes with the removal of masking tape and a final inspection of the hull coverage.11:04

Ver no YouTube

Mais de Sailing Catalpa

the most sharks we have ever seen10/2026the clearest water we have ever seen...The Tuamotus10/2026arriving to the most remote atolls on earth...the Tuamotus09/2026they weren't expecting this09/2026

De Sailing Catalpa — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema