Sailing Catalpavídeo

One step closer to splashing | Ep 388

24 de dezembro de 2023 · 13 min · 9K visualizações

O que este vídeo aborda

The crew of the 53-foot Catalpa applies a two-part epoxy barrier coat to the vessel’s hull while in a boatyard.0:43 After patching osmosis blisters, the team cleans the fiberglass surface with acetone to ensure proper adhesion.1:01 They use a 3/16-inch nap roller to achieve a smooth finish, applying the epoxy in sections to prevent premature drying and peeling.4:52 The process involves mixing four one-gallon tins of Total Boat barrier coat, which requires a 15-minute induction period before application.9:49 To maintain a continuous wet edge and avoid the need for sanding between layers, the crew applies multiple coats in a single session.8:40 They use Blu-Tac to protect the cutlass bearing adjustment screws from being sealed over during the painting process.2:09 The project concludes with the removal of masking tape and a final inspection of the hull coverage.11:04

Assistir no YouTube

Mais de Sailing Catalpa

the most sharks we have ever seenout. de 2026the clearest water we have ever seen...The Tuamotusout. de 2026arriving to the most remote atolls on earth...the Tuamotusset. de 2026they weren't expecting thisset. de 2026

De Sailing Catalpa — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema