Sailing Catalpavidéo

One step closer to splashing | Ep 388

24 décembre 2023 · 13 min · 9K vues

Ce que couvre cette vidéo

The crew of the 53-foot Catalpa applies a two-part epoxy barrier coat to the vessel’s hull while in a boatyard.0:43 After patching osmosis blisters, the team cleans the fiberglass surface with acetone to ensure proper adhesion.1:01 They use a 3/16-inch nap roller to achieve a smooth finish, applying the epoxy in sections to prevent premature drying and peeling.4:52 The process involves mixing four one-gallon tins of Total Boat barrier coat, which requires a 15-minute induction period before application.9:49 To maintain a continuous wet edge and avoid the need for sanding between layers, the crew applies multiple coats in a single session.8:40 They use Blu-Tac to protect the cutlass bearing adjustment screws from being sealed over during the painting process.2:09 The project concludes with the removal of masking tape and a final inspection of the hull coverage.11:04

Regarder sur YouTube

Plus de vidéos de Sailing Catalpa

Sailing to the most remote waves in the tuamotusoct. 2026the most sharks we have ever seenoct. 2026the clearest water we have ever seen...The Tuamotusoct. 2026arriving to the most remote atolls on earth...the Tuamotussept. 2026

De Sailing Catalpa — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème