Eternal Sailingvídeo

We have been working towards this MOMENT for 8 MONTHS! | Eternal Sailing | Episode 59

20 de abril de 2024 · 18 min · 7K visualizações · Carriacou

O que este vídeo aborda

After three and a half weeks in a shipyard on Carriacou, the crew prepares their vessel for relaunch following extensive hull and mechanical repairs. Work includes fairing the hull with West System 407 epoxy filler, applying International Primocon 1K primer, and installing a new holding tank with custom-fitted lash points.2:09 The rudder, which required significant structural reinforcement and fiberglass matting, is finalized and aligned.4:59 Maintenance tasks include changing diesel filters, replacing the engine oil, and installing a new impeller in the cooling system.8:34 The crew also fabricates a new bearing surface for the rudder head using epoxy-laminated discs to protect the skeg.11:38 After selling a problematic 6-hp Suzuki outboard, they plan to source a reliable replacement in Martinique.13:23 Following a final application of antifouling paint to the keel, the boat is successfully launched, with all through-hull fittings and the shaft seal confirmed watertight after an hour of engine testing at the dock.16:26

Ver no YouTube

Mais de Eternal Sailing

A SUN ROOF for our CATAMARAN! ⛵️ Preparing for the long voyage...09/2026Even more rotten wood and a RAT on board?? What is going on here? 😟08/2026Can I fix ALL of this? 😟 Shipyard Part 2/208/2026Back on land after nearly 3 years - nasty surprise?? Shipyard part 1/207/2026

De Eternal Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema