Eternal Sailingvideo

We have been working towards this MOMENT for 8 MONTHS! | Eternal Sailing | Episode 59

20 April 2024 · 18 min · 7K views · Carriacou

What this video covers

After three and a half weeks in a shipyard on Carriacou, the crew prepares their vessel for relaunch following extensive hull and mechanical repairs. Work includes fairing the hull with West System 407 epoxy filler, applying International Primocon 1K primer, and installing a new holding tank with custom-fitted lash points.2:09 The rudder, which required significant structural reinforcement and fiberglass matting, is finalized and aligned.4:59 Maintenance tasks include changing diesel filters, replacing the engine oil, and installing a new impeller in the cooling system.8:34 The crew also fabricates a new bearing surface for the rudder head using epoxy-laminated discs to protect the skeg.11:38 After selling a problematic 6-hp Suzuki outboard, they plan to source a reliable replacement in Martinique.13:23 Following a final application of antifouling paint to the keel, the boat is successfully launched, with all through-hull fittings and the shaft seal confirmed watertight after an hour of engine testing at the dock.16:26

Watch on YouTube

More from Eternal Sailing

A SUN ROOF for our CATAMARAN! ⛵️ Preparing for the long voyage...Sept 2026Even more rotten wood and a RAT on board?? What is going on here? 😟Aug 2026Can I fix ALL of this? 😟 Shipyard Part 2/2Aug 2026Back on land after nearly 3 years - nasty surprise?? Shipyard part 1/2Jul 2026

From Eternal Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue