Project Brupegvídeo

Building the Exhaust Stack - Project Brupeg Ep.333

10 de dezembro de 2023 · 38 min · 40K visualizações

O que este vídeo aborda

The owners of the former fishing trawler *Brewpeg* are extending the vessel's main and generator exhaust stacks to prevent exhaust fumes from entering the wheelhouse and solar array.12:08 Because the boat lacks the high A-frame structures used by commercial trawlers for bracing, the crew must balance stack height against the need for structural stability.17:33 They fabricate a 1.37-meter extension for the six-inch stainless steel main exhaust using a jig made from angle iron to ensure alignment during welding.22:31 To manage engine room ventilation and fire safety, they design a stainless steel shroud that acts as an air-cooled chimney, incorporating a closable vent flap for CO2 fire suppression.12:37 The project also includes installing rubber-mounted six-inch exhaust clamps to prevent stress fractures.34:04 Work is currently restricted to a temporary work berth, as the vessel’s upcoming move is delayed by a nearby cyclone.33:20 The crew prioritizes exterior welding and fabrication tasks while in the berth, as these are not permitted at their next location.12:15

Ver no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.46310/2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.46209/2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.46109/2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema