Sailing Big Lostvídeo

3-Month Wait Over: Lithium Power for Our Catamaran!

29 de outubro de 2024 · 15 min · 1K visualizações · Rio Dulce

O que este vídeo aborda

The crew of the catamaran Big Lost experiences a significant delay in their departure from Guatemala while awaiting a battery monitoring system (BMS) for their new Victron Energy lithium-ion battery bank.8:24 Although six batteries arrived as scheduled, the missing BMS prevents installation and forces the crew to remain in the Rio Dulce area for an additional week.8:35 During this wait, the crew performs maintenance tasks, including cleaning a faulty black tank sensor and addressing a leaking port light window in the midship cabin.12:19 The window’s Sikaflex sealant has failed, causing water damage to the surrounding wood, and the lack of local supplies like Sikaflex primer complicates the repair.12:57 The crew plans to install the BMS upon arrival, test the electrical system, and then clear out of the country to sail toward Utila in the Bay Islands of Honduras.14:36

Ver no YouTube

Mais de Sailing Big Lost

We Went Back to the Life We Left Behind… But It Felt Different10/2026We Swam With Humpback Whales… Then Left Our Boat Behind10/2026We Finally Stopped Rushing… Life Aboard Got Quiet09/2026We Almost Left Tahiti… I’m Glad We Stayed09/2026

De Sailing Big Lost — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema