Sailing Big Lostvideo
3-Month Wait Over: Lithium Power for Our Catamaran!
October 29, 2024 · 15 min · 1K views · Rio Dulce
What this video covers
The crew of the catamaran Big Lost experiences a significant delay in their departure from Guatemala while awaiting a battery monitoring system (BMS) for their new Victron Energy lithium-ion battery bank.8:24 Although six batteries arrived as scheduled, the missing BMS prevents installation and forces the crew to remain in the Rio Dulce area for an additional week.8:35 During this wait, the crew performs maintenance tasks, including cleaning a faulty black tank sensor and addressing a leaking port light window in the midship cabin.12:19 The window’s Sikaflex sealant has failed, causing water damage to the surrounding wood, and the lack of local supplies like Sikaflex primer complicates the repair.12:57 The crew plans to install the BMS upon arrival, test the electrical system, and then clear out of the country to sail toward Utila in the Bay Islands of Honduras.14:36
More from Sailing Big Lost
From Sailing Big Lost — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



