Sailing Big Lostvidéo

3-Month Wait Over: Lithium Power for Our Catamaran!

29 octobre 2024 · 15 min · 1K vues · Rio Dulce

Ce que couvre cette vidéo

The crew of the catamaran Big Lost experiences a significant delay in their departure from Guatemala while awaiting a battery monitoring system (BMS) for their new Victron Energy lithium-ion battery bank.8:24 Although six batteries arrived as scheduled, the missing BMS prevents installation and forces the crew to remain in the Rio Dulce area for an additional week.8:35 During this wait, the crew performs maintenance tasks, including cleaning a faulty black tank sensor and addressing a leaking port light window in the midship cabin.12:19 The window’s Sikaflex sealant has failed, causing water damage to the surrounding wood, and the lack of local supplies like Sikaflex primer complicates the repair.12:57 The crew plans to install the BMS upon arrival, test the electrical system, and then clear out of the country to sail toward Utila in the Bay Islands of Honduras.14:36

Regarder sur YouTube

Plus de vidéos de Sailing Big Lost

We Went Back to the Life We Left Behind… But It Felt Differentoct. 2026We Swam With Humpback Whales… Then Left Our Boat Behindoct. 2026We Finally Stopped Rushing… Life Aboard Got Quietsept. 2026We Almost Left Tahiti… I’m Glad We Stayedsept. 2026

De Sailing Big Lost — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème